SpecificationHow engineers review substitution requests and what suppliers should include to get approval.
An or equal clause lets a contractor propose a product that matches the specified one. The engineer decides whether it does.
A cut sheet, a comparison to the basis of design, material and rating data, test standards and any exceptions listed plainly.
Pressure and temperature ratings, materials, face to face dimensions, actuator mounting, test standards and warranty.
Substitution requests slow down when they arrive late. Ask during the bid period, while the engineer can still respond.
Being named in the specification avoids the substitution process. That is the purpose of approved manufacturer lists.