What Moves the Budget on a Data Center Construction Project

Data center cost is shaped by a few big choices: power and cooling scope, redundancy, location, labor and materials, and decisions owners make along the way.

Key takeaways

  • Electrical and cooling systems usually make up a large share of the budget, much more than the building shell.
  • Redundancy, density and location are early decisions that can move cost up or down by a wide margin.
  • Late changes by the owner often cost more than almost any other single factor.

The cost of a data center depends mostly on what goes inside the building, not the building itself. Power and cooling systems tend to take a large share of the budget. Redundancy, location, labor, materials and owner decisions then add or remove cost. The honest answer to what a project costs is that it depends on these choices.

Power and cooling

A data center is a machine for delivering power and removing heat. The electrical path includes utility connections, transformers, switchgear, backup generators, batteries and distribution to the racks. The cooling path includes chillers or other heat rejection, pumps, pipes, valves, air handlers and, in some designs, liquid cooling equipment. These systems are large, complex and often custom sized. Together they usually outweigh the cost of the structure around them.

Redundancy

Redundancy means building spare capacity so that a failure does not stop the site. A design that can lose one major unit and still run needs more equipment than a design with no spare. A design that can lose a whole power path and still run needs more again. Each step up adds equipment, space and complexity. The right level depends on how much downtime the customers can accept.

Density and design choices

  • Rack density. Higher power per rack changes the electrical and cooling design, and may require liquid cooling.
  • Cooling method. Air, liquid or mixed systems differ in equipment and piping.
  • Phasing. Building all capacity at once or in stages changes upfront cost and risk.
  • Future readiness. Leaving space and capacity for growth costs something now but may save money later.

Location

  • Land cost and site conditions, such as soil and drainage.
  • Distance to power and the cost of utility upgrades.
  • Water supply or the need for water saving designs.
  • Climate, which affects cooling equipment and energy use.
  • Local labor availability and permit rules.

Labor and materials

Skilled trades such as electricians and pipe fitters are in demand in many places. Where labor is short, wages and schedules both feel the pressure. Material prices for steel, copper and concrete move over time. Equipment lead times matter too. A late delivery can add costs from idle crews and extended site overhead.

Owner decisions that move the budget

  1. Choosing the standard level of quality and finish.
  2. Deciding which equipment the owner buys directly and which the contractor buys.
  3. Approving the design early and holding to it.
  4. Setting the commissioning scope.
  5. Choosing the delivery method, such as a single contractor for design and build or separate contracts.
  6. Changing the plan after work has started.

Mistakes to avoid

  • Comparing cost per megawatt between projects without checking that the scope is the same.
  • Leaving out owner costs such as utility fees, permits, insurance and financing.
  • Setting no reserve for surprises.
  • Making late design changes after equipment is ordered.
  • Choosing the lowest first cost without looking at running cost.

Questions to ask

  • What is included and excluded in this estimate?
  • What redundancy level does the number assume?
  • Which items have price risk or long lead times?
  • How much contingency is set aside, and who controls it?
  • What would change if capacity were built in phases?

A budget is a set of decisions written as numbers. Clear early decisions are usually the cheapest ones.

A simple way to compare options

When two designs are close, line them up by total cost over time. Add the construction cost, then the yearly running cost for power, water and upkeep, then the cost of risk, such as downtime. A cheaper option that costs much more to run may not be cheaper at all. A more expensive option that avoids a costly outage may pay for itself.

Keep the comparison honest by using the same assumptions for each option. Write them down, so that others can check them. Budgets are easiest to defend when every number has a clear source and a stated scope. Also ask what the estimate leaves out. Many surprises come from items nobody priced, not from items priced badly.

Found this useful? Pass it on.

This article is general information for public education. It is not legal, tax, financial or engineering advice. Rules and conditions differ by location, so check with qualified local professionals. Spot an error? Write to info@datacenteroutreach.com and we will correct it.